ATDINUM ENERGY INC.
(Renewable Energy Engineering, Development, Operations and Marketing)
The Department of Energy (DOE) publishes annually the Distribution Development Plan (DDP) of all distribution utilities (DUs) in the country. The DOE consolidates into the national DDP the individual DDPs of DUs: the Private Investor-Owned Utilities (PIOUs), Local Government Unit-Owned Utilities (LGUOUs), Multipurpose Cooperatives, and the Electric Cooperatives (ECs) as endorsed by the National Electrification Administration (NEA).
The annual submission and preparation of DDP is in compliance with Republic Act No. 9136 and is prescribed by the DOE Department Circular No.2004-02-002.
The DDP covers the DUs' 10-year program of acquisition of sub-transmission assets, expansion and rehabilitation of distribution facilities and the costs associated with these activities in order to deliver the electric power services to the projected number of customers, and their corresponding energy and demand requirements.
The 2010 DDP contains the individual DDPs of 122 DUs. This is the seventh annual update of DUs consolidated DDP.

9.0 COTO 1 HEP
Location: Taltal, Masinloc, Zambales
Catchment Area: 60.32 sq km
Net Head: 180.46 m
Discharge: 5.74 cms
Capacity: 9000 kw
Est Annual Generation: 34,086,387 kw-hrs

3.5 COTO 2 HEP
Location: Taltal, Masinloc, Zambales
Catchment Area: 104.91 sq km
Net Head: 40.0 m
Discharge: 10.0 cms
Capacity: 3500 kw
Est Annual Generation: 13,191,964 kw-hrs

2.2 COTO 3 HEP
Location: Taltal, Masinloc, Zambales
Catchment Area: 16.35 sq km
Net Head: 162.0 m
Discharge: 1.52 cms
Capacity: 2200 kw
Est Annual Generation: 9,105,444 kw-hrs